The Salvation Army Lot Improvements

Multiple locations throughout the Chicago Metropolitan Division area.

Client:

The Salvation Army

Project Type:

Commercial - Parking Lot Improvements

Construction Cost

$7,500,000

Project Description

From 2016 through 2020, HOH provided Planning, Design and Construction Management services for the Salvation Army for various parking lot and facility improvement projects at 16 locations, totaling 1,528 stalls, throughout the Chicago Metropolitan Division area and Northwest Indiana.

Scope of Work

Provided Construction management services including coordination, oversight, inspection, show drawing review, materials review, RFI’s, clarifications, change orders and addendums.

HOH services consisted of the following:

  • Pavement design included lot expansion, pavement removal and replacement, and

    pavement rehabilitation (mill, patch, and overlay) of existing parking facilities.

  • Checking of existing lot & roof drainage, sewers, and design of new sewers/connections. Checking each location for ADA compliant ramps, and design of new ADA ramps. New fencing, gates, and guardrail, and repair or replacement as required.

  • Preparing full contract documents including Plans, Specifications and Engineers estimate.

  • Securing permits from the OUC, CDOT, MWRD, IEPA and various municipalities