Client:

Capital Development Board

Project Type:

Higher Education - Roadway, parking lot improvement

Project Size:

X

Construction Cost

$500,000

Illinois Community College Board, Roadway, Parking lot, and Dock Improvements

McHenry County, IL

Project Description

The scope included Study, Design and Construction Management for the removal and replacement of the main access roadway and parking lot from the outer college ring road to the Building B dock, also including a new dock leveler, along with stairway, pedestrian ramp, and drainage improvements at McHenry County College. HOH provided an initial assessment of all facilities, including pavement, sidewalks, ADA, signing, lighting, and drainage to define the project scopes.

HOH procured, coordinated and subcontracted out all surveying, geotechnical and testing services during design and construction.

HOH provided a Project Report containing narratives, field assessments, plans, pictures, and recommendations for the following: 7 PCC and HMA Pavement Alternates, 3 Dock Leveler Options, 3 Retaining Wall Alternates, and a stone shoulder vs curb and gutter edging option.

HOH provided Design Engineering services by developing plans, specifications and cost estimates for the project. This included PCC and HMA pavement reconstruction and replacement, ADA ramps, sidewalk replacement, drainage improvements, signing, striping, landscaping, and Construction Phasing.

 HOH secured all required design and construction permits including City of Crystal Lake permits. HOH provided Post Design Services including bid package assembly, bid award, issuance of Addendums and Construction Management Services.