NIPSCO Bailly and RMS WWTP

Description of Project:

New 18,000 gpd Sewage Treatment Facility for CLIENT’S Generating Station in Indiana.

Scope of Work:

HOH initially prepared a preliminary engineering study to quantify current loading and to identify and evaluate several different treatment options for the plant’s sewage waste stream. HOH then performed the complete detailed engineering design for installation of the new sewage treatment facility including mechanical, electrical, civil, and structural plans and specifications. The design included a steel canopy structure to provide partial protection from the elements and demolition and removal of the previous outdated facility.

Value to Client:

Precast treatment tanks provided reduced cost-versed field-poured tanks and improved reliability and lifespan over steel tanks.

The design included refurbishment of an existing plant building to house blowers and controls.

Piping design and construction sequencing allowed minimum downtown for the plant’s sewage system.