Client:

Chicago State University

Project Type:

Higher Education

Roadway, Parking Lot, Walkway Improvements

Project Size:

  • Parking Lots (72,000 SY)

  • Concrete walkways ( 70,000 Square Feet)

  • Driveway (45,000 SY)

  • HMA Walkways (10,000 SY)

Construction Cost

$7,000,000

Chicago State University Roadway, Parking Lot & Walkway Improvements

Chicago, IL

Project Description

This project consisted of the evaluation and improvement of all infrastructure at Chicago State University, Including: roadways, parking lots, walkways, & drainage.

Scope of Work

The scope of work included evaluating the following infrastructure at CSU which dates to the original construct of 1970 with limited improvements. The design work included:

  • Reconstruction of 18 HMA parking lots (72,000 SY)

  • Removal and replacement 70,000 square feet of concrete walkways

  • Reconstruction of 3.5 miles of driveway (45,000 SY)

  • Evaluation of HMA walkways (10,000 SY)

  • Reconfiguration of handicap stalls and ADA routes to buildings